DSR-70/70P
Installation
3Take up the slack in the cables by inserting them first into
the cable holder on the left, then the cable holder on the
right, then again into the cable holder on the left, as shown
in the figure (left and right are as seen from the rear of the
DSR-70/70P).
YELRED
Wire clip
5Insert the SDI-39 board into the second slot from the front
of the DSR-70/70P. Holding the levers on both sides of the
board, slowly slide it into place.
When the board is inserted until the levers are aligned with
To SDI-39 boardthe board retaining rail, lower the levers slightly to seat the
Cableboard firmly, then lower the levers to be flush with the
holdersedge of the board.
Levers
From
connector panel
SDI-39 board
Notes
Y When winding the cables around the cable holders, do not
pull them tight. Loop them loosely through the cable
holders as shown in the figure.
Y Make sure that the cables do not pass over or under any
board levers.
4Place the SDI-39 board above the opening where theBoard retaining rail
battery panel was removed, and connect the cables to the
board.
Attach the red and yellow cables to their respective RED
and YEL connectors on the board.
RED: red cable
YEL: yellow cable
Wind the wire clip around the cables.
(Continued)
1-83
1617 |