5-1-4. CHECK AND ADJUSTMENT
Y When the parts of the tape path (tape guide, reel table, etc.) have been removed or paring parts hatsve been replaced, adjust the follow
according to the flowchart below.
Y ADJUSTMENT POSITION
TG3TG6
(Tracking entrance, curl)(Tracking exit, curl)
TG2
TG7
(TG2 height/FWD height, curl)(TG7 height/RVS position, curl)
TG1Spring hook slider
(TG1 height, curl)(RVS back tension)
TG8
(TG8 height, curl)
Spring hook slider
(FWE back tension)
T band adjuster
S band adjuster
(RVS position)
(FWD position)
RV3
Reel table
RV1
RV1 to 4 (MD-76 board)(height)
RV4
(TG2/7 electric tension regulator)
RV2
Y ADJUSTMENT ORDER (FLOWCHART)
ADJUSTMENT START -1
ADJUSTMENT START -24-1. REEL TABLE HEIGHT CHECK AND ADJUSTMENT
If the TG1/8 guide is not
replaced and removed,
4-2. TG1/8 HEIGHT CHECK AND ADJUSTMENT
proceed to TG2/7 height
adjustment.
4-3. TG2/7 HEIGHT CHECK AND ADJUSTMENT
4-4. FWD/RVS POSITION CHECK AND ADJUSTMENTADJUSTMENT START -3
When only the TG1/8 guide
is replaced, perform tape 4-5. TG2/7 ELECTRIC TENSION REGULATOR CHECK AND ADJUSTMENT
path adjustment after height
adjustment.4-6. FWD/RVS BACK TENSION CHECK AND ADJUSTMENT
ADJUSTMENT START -4
4-7. PREPARATION FOR ADJUSTMENT AND TAPE PATH CHECK
4-8. TRACK ADJUSTMENT AND CHECK
4-9. TRACK CHECK
4-10. CUE/REV CHECK
Tape Path Adjustment
4-11. CURL CHECK AND CURL ADJUSTMENT
4-12. RISING CHECK
ADJUSTMENT END